Mike's Notes
Work is underway to move Pipi 9 to the beginning of the Pipi Core Data Centre.
Resources
- https://www.blog.ajabbi.com/2025/05/a-three-data-centre-model-for-pipi.html
- https://www.blog.ajabbi.com/2025/04/data-centre-options-for-pipi-9.html
- https://www.blog.ajabbi.com/2026/01/net-snmp-for-pdu.html
- https://www.blog.ajabbi.com/2026/02/gis-mapping-options.html
- https://www.blog.ajabbi.com/2025/05/a-roadmap-to-pipi-10.html
References
- Reference
Repository
- Home > Ajabbi Research > Library >
- Home > Handbook >
Last Updated
03/03/2026
Firing up the data centre
Mike is the inventor and architect of Pipi and the founder of Ajabbi.
Long planned, Pipi 9's migration to its own data centre is now underway. The job has top priority and should be easily completed in a week.
First, the existing Ajabbi computer network was split into two.
- A small start on the Pipi Core Data Centre to be built out over time, with an attached Mission Control. It is completely isolated from the internet, with all wifi and Bluetooth disabled. It is largely housed in the first 45U rack and some open shelving.
- The start of the Ajabbi Office Network. It is connected to the internet for email, Zoom/Meet/Teams calls, office work, writing documentation, minor development, testing, graphics, video editing, office servers, accounts, printing, phones, etc.
Racks
45U Rittal welded rack frames will be added as required. Each with the following standard modular fitout.
- UPS
- Individually switched PDU
- Network switches
- Monitoring
- Servers
- NAS
- Cooling
DevOps
Developer laptops attached to the isolated rack for server work have the following minimal developer stack.
- Acrobat
- BoxLang
- CFML Server Dev edition
- DBeaver
- Dreamweaver
- GeoServer
- Grammarly
- JRE 21
- MS Access
- MS Excell
- NoteTab Light
- PostgreSQL+PostGIS
- Protege
- Python
- QGIS
- VS Code
- etc
Initially, the data centre will often be turned off. It will be turned on to allow hundreds of Pipi Agents to run batch jobs autonomously. Eventually, many racks will be running 24x7x365.
Moving Pipi 9 to a data centre now opens the door to Pipi 10 in 2027.
Mission Control
The future Mission Control UI, connected to the data centre, could be shared via a live video feed of a monitor, ensuring security against hackers. It could even be a YouTube Live Stream of probes for those who don't like to sleep. 😀 Though my cat tells me it is much better to watch squirrels on YouTube. 😸😹😺😻😼😽
No comments:
Post a Comment